| Location | NAKHON SI THAMMARAT, THAILAND |
| Owner | PTT Public Company Limited |
| Employer | PTT Public Company Limited |
| Main Contractor | |
| Contract Period | 2011 |
| Percentage Completed | Finished |
| Role | Main contractor |
| Project Detail |
Slope Stabilization works : - Clearing and Grubbing - Rockfall netting Type M3-b - Anchorage bar Ø 25 mm, 4 m long @ 1.5x1.5 m - Soil Nail/Rock bolt Ø 25 mm, 6 m long @ 1.5x1.5 m - Shotcrete (250 ksc) - Weld wire fabric Ø 4 mm #100x100 mm - Anchorage road Ø 9 mm, 0.75 m long @1.5x1.5 m - Horizontal drain 8 m long @5.0 m - Weep hole Ø 50 mm @1.5x1.5 m - Shear key at toe slope - Interceptor ditch (0.3x0.3m) - Stepped drain chute - Concrete ditch lining (Type I) - Sacrificial soil nail/rockbolt Ø 25 mm, 6 m long & verification pull-out test - Proof pull-out test |