Location | PHETCHABUN, THAILAND |
Owner | Department of Highways |
Employer | Department of Highways |
Main Contractor | Right Tunnelling Public Company Limited. |
Contract Period | 2012 - 2013 |
Percentage Completed | Finished |
Role | Main-contractor |
Project Detail |
- Soft Materrial Excavation - Drilling work for install soil Nail 4” 10 m.long - Drilling & install Horizontal drain,Slot PVC.Class 13.5 f 2.5’’ with Geotextile - Scarification & reconstruction of existing base 10 cm .thick - Earth Embankment - Concrete Interception on cut berm - R.C. Drain Chute for Embankment protection - Side ditch lining type II - Vetiver Grasssing for Slope Protection |